Investment Environment
¡¡¡¡Well-Developed Transportation The first stage of construction has just been completed for Qili Harbour, a
state-invested kdy harbour which, when completed, will dispatch goods to every
major harbour of China with a designed annual cargo handling capacity of 3.59
million tons. Yueqing's access to Wenzhou Airport, which operates airlines to
Hong Kong, Macao and major cities in China, is by a bridge across the river.
Yueqing is also a little more than 30 kilometres away from Luqiao Airport of
Taizhou, a municipality to the north. Yueqing is also crisscrossed by State
Highway 104 and the newly built Jinhua-Wenzhou Railway. The Wenzhou Bridge and
the Huwuling Tunnel, which are part of the Yueqing section of the
Ningbo-Taizhou-Wenzhou Expressway, have just been completed and opened to
traffic, and the second stage of construction of the expressway is in high swing.
¡¡¡¡Conbenient Telecommunications Yuecheng Town and Yandang Mountain in
Yueqing Municipality are where the large-capacity
Shanghai-Zhejiang-Fujian-Guangdong optical trunk cable is notched. Yueqing
operates its own program-controlled telephone network with a total capacity of
320,000 sets, which average 13.54 per hundred residents. There are also 150,000
cell phone users, and local residents can make direct phone calls to 188
countries and regions. Other telecommunications services are also available in
Yueqing, such as telegraph, fax, IP phone, ISDN service, express mail, and the
mixed platform 163 and 169. The municipal people's government has also opened its own Internet website at http://www.yueqing.org.
¡¡¡¡Sufficient Power Supply The first stage of construction of Yueqing's
Panshi Power Plant with a total installed capacity of 1.45 million kw has just
been finished, putting two 125,000-kw generating sets into full operation. The
second stage of construction is under way. The entire municipality is covered
with a rationally distributed and reliable power grid.
|